How we operate

  • Site identification

  • Analysis of the constraints and authorisation procedure (VIA, AU, PAUR, PAS)

  • Mechanical, electrical, and infrastructure design for connection to the National Transmission Grid

  • Managing the licensing process

  • Carrying out network management practices for connecting the system

  • Legal, economic, and financial due diligence

  • Paperwork for any incentives available

  • Constructing the plant

  • System maintenance

  • Monitoring

  • Periodic checks with the aid of specialised equipment (e.g., drones, thermographic instruments)

HydroSolar is developing projects throughout Italy. The map shows the projects at various stages of development, producing a total of 170 MW.

We currently have a 500 MW development programme. The units will be installed mostly in disused quarries.